Добавил:
Опубликованный материал нарушает ваши авторские права? Сообщите нам.
Вуз: Предмет: Файл:

УПП / Курс 2 / Семестр 4 / Иностранный язык (английский) / ОТВЕТЫ НА ЭКЗ ПОЧТИ ПОЛНЫЙ БАНК ВОПРОСОВ

.pdf
Скачиваний:
34
Добавлен:
06.10.2022
Размер:
5.21 Mб
Скачать

Задание 4

etc.

i.e.

e.g.

et al.

Задание 5

В зависимости от требований к технологии работы на железнодорожной станции

Различают (1) автономные

The first category of railway engineering provides for высокоскоростныежелезныедороги

Railway structures encompass a wide array of construction intended to support the trakc itself or house railway operations. Common examples of (1)

Examples of common ancillary structures are … дренажныесооружения,

Задание 6

Interlocking

Covered wagon

Open wagon

Goods station

Attendant

Conductor rail

Crossing

Point

Commuter train

Level crossing

Controller

Sleepers

Marshalling yard

Задание 7

Придет день, когда вы сможете увидеть поездку из Лос-Анджелеса в Сан-Франциско менее чем за три часа со скоростью 220 миль в час

Эту дорогу будут строить в течении всего лета

Три троса были пусты, а на остальных двух вагонетки находились на этой стороне

Put the words into the correct order to ask a subject question.

Put the words into the correct order to ask a subject question.

Put the words into the correct order to ask a subject question.

Put the words into the correct order to ask a subject question.

Put the words into the correct order to ask a subject question.

Put the words into the correct order to ask a subject question

Put the words into the correct order to ask a subject question

Put the words into the correct order to ask a subject question

The engineer asked a shunter, Why haven’t you done the assignment?

The inspector asked, What caused the accident?

My colleague asked me, Are you tired?

Задание 8

The flat yard requires high capital investment

There is no need for special shunting engines at gravity yards

There is more than one group of railway engineering skills required to manage trains running through the CTRL

IT specialists are responsible for guide, power, and control the rolling stock for safety environment for transporting passengers and goods though the CTRL

The hump yards are the largest and most effective classification yards

‘System-wide’ railway engineering contracts are geographically fixed